IPDB › China Industry › Tools & Hardware
China, Chinese Goodeng GMS5000 Versatile Mud Mixing System for Construction Projects1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Drilling ToolsOther Drilling ToolsMud Mixing SystemConstruction Mud System
Jiangsu Goodeng Heavy Machinery Technology Co., Ltd
Preview:
Product Description Product Description The creation of mixed mud, which is frequently utilized in non-excavation pipeline construction, geological drilling, and petroleum drilling, is the primary purpose of the mud mixing system.Excellent mixing effectiveness and comprehensive mixingHigh processing speed, quick turnaround, and labor-savingSafe and dependable operation, portable, robust, and long-lastingThe mud mixing system consists of mud tanks, pump sets, jet devices, mixers, electrical control systems, valve sets, and piping systems. The jet mixing device can achieve rapid pulping and mixing, making the added drugs and bentonite evenly dispersed and less prone to clumping. Mud tanks can be equipped with single or multiple units. The number and power of agitators depend on the size and volume of the mud tank, and the mud pump uses mud.Product ParametersItemMetric UnitImperial UnitCapacity 5000 L1321 gallonDimension2800*1800*2000 mm110*71*79 inchWeight970 kg2138 lbsEngine11hp 8.7 kw5hp 3.6 kwEfflux 11hpStir 5hpCycling volume30 m3/h1060 cf/hOutlet3 inch3 inchLift20 m66 feetDetailed Photos Company Profile Goodeng Machine was established in 2002. The company has production bases locating in China and Thailand and 2 overseas branch offices locating in Malaysia and India, covering a total area around 200,000 square meters.The main products include GS series horizontal directional drilling rigs, GPY series static hydraulic piling rigs, GM series open-pit surface drilling rigs and drilling tools. Annual sales exceed 3,000 units.We have offices and professional after-sales service teams in many countries. We will provide you with engineering training, installation and commissioning services.We can aslo provide the complete solution for engineering construction.Project CasesExhibitionCertificationsFAQ1. What about the warranty time? A:12 months after shipment or 2000 working hours,whichever occurs first.2. What about the delivery time? A:20 days after receiving the deposit.3.What kind terms of payment can be accepted? A:On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client. On L/C term, 100% irrevocable L/C without"soft clause" can be accepted. 4.What logistics ways we can work for shipment? A: We can ship machine by sea and road.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...