IPDB › China Industry › Metallurgy, Mineral & Energy
China, Chinese Tanzania 200tpd Gold Ore Processing Plant Advanced Cil Method for Maximum Recovery1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Mining MachineryLeaching TankGold Ore Processing PlantCil Gold Processing Plant
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd.
Preview:
Product Description Tanzania 200tpd Gold Ore Processing Plant Advanced CIL Method for Maximum Recovery Product Description1.Intruduction of Gold processing Plant:In CIL Gold Processing Plant, activated carbon acts like a sponge to aurocyanide and other complex ions in solution. Hard carbon particles (much larger than the ore particle sizes) can be mixed with the ore and cyanide solution mixture.The gold cyanide complex is adsorbed onto the carbon until it comes to an equilibrium with the gold in solution. Because the carbon particles are much larger than the ore particles, the coarse carbon can then be separated from the slurry by screening using a wire mesh.Working Principle2.CIL Gold Processing Systemt of Description: A. After the crushing and grinding stage, add 9 step-arranged high-efficiency cyanidation leaching tanks into the pulp. Gold pulp cyanidation is carried on the first two leaching tanks, countercurrent adsorption operation is carried on the last six or seven leaching tanks. Compared with gold CIP process and other traditional gold extraction processes, gold CIL process greatly shortens the cyaniding time, reduces the capital backlog in the gold retention stage. Taking the gold cyanidation plant with processing capacity of 100000 tons and gold grade of 7.5 g/t as an example, gold CIL process can save the investment cost of $486000 than the CIP process, reduce the capital backlog of $201700, save and recycle capital of $675100 in advance excluding the cost of activated carbon.B. In the adding activated carbon step, add the coconut shell activated carbon (small hole, high activity, wear-resisting and renewable) specially selected by Hengchang mineral processing design institute into the pulp, which can dissolve and adsorb the gold and silver ions then form the gold loaded carbon according to the characteristics of gold and silver adsorption.C. Vibrating screen and dewatering screen are the key equipment for the reverse movement of pulp and carbon. Filter press and high frequency dewatering screen developed by Hengchang can effectively reduce the carbon wear on the surface of vibrating screen and in the process of continuous slurry pumping, and reduce the cost, facilitate the maintenance and operation.D. Hengchang desorption electrolysis system implements high-temperature desorption electrolysis on gold in the gold-loaded carbon through the mixed liquor of sodium cyanide and sodium hydroxide. After wood chips and other sundries are removed by washing machine, and the gold desorption is carried out by Xinhai high-temperature and high-pressure desorption method (150 degrees and 0.5Mpa), which can resolve 99% of gold within 2-6 hours. 3. Structure of Leaching Tank:Product Parameters4.Main Technical of Leaching Tank:ModelTank Spec.(mm) Effective Volume(m3)Impeller revolution(r/min)Motor power(kw)Weight(kg)SJ2.0X2.52000X25007.07522.22144SJ2.5X2.52500X250010.84342729SJ2.5X3.152500X315013.92522.23095SJ3.0X3.03000X3000194344583SJ3X3.153000X3150204344160.6SJ3X3.53000X350022.974344334.6SJ3.15X3.553150X355025.734344322.8SJ3.5X3.53500X350031.3525.55025SJ3.5X43500X400035.6525.55429SJ3.55X4.03550X400036.84345025SJ3.7X4.23700X4200424246153SJ4.0X4.54000 X450052.78357.57569SJ4.0X64000 X60007133119200SJ4.5X5.04500 X500074.75357.510864SJ5.0X5.65000X5600104.5311114291SJ5.5X6.05500X6000135.42311118745SJ6.5X7.06500X7000215212225978SJ7.0X7.57000 X7500269212229030SJ7.5X8.07500 X8000331232232796SJ8.0X8.58000X850040218.53042467.3SJ8.5X9.08500X900048018.530466235.Features of Leaching Tank:1. It lowers the gold processing plant operation cost.2. It increases gold recovery rate to a degree of 99%.3. It is suitable for the treatment of oxidized gold ore with low sulfur content and mud content.4. It ensures the gold and silver dissolution and the adsorption of activated carbon synchronously.Installation Instructions6.Gold Processing Plant of working site:Company Profile7.About our factory:Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd. is located in No.3 Chuangye Road. Guzhang In dustrial Park. Shicheng County. Ganzhou City. Jiangxi Province. China.Our company is engaged in the mineral processing equipment research, development, design and production for many years history, has accumulated rich experience in design and production. Enterprise in mineral processing equipment industry has had a positive effect, set up the good reputation. And mainly the manufacture of the products like as Shaking table. Flotation equipment. Crushing equipment. Magnetic separator. Screening equipment. Classifying equipment. Agitation tank, Feeding equipment. Gravity separation equipment. Wet separation equipment. Spiral chute. Saw-tooth wave jig and Diaphragm Jig. Grinding equipment. Ball mill. Slurry pump. Centrifugal pump, Conveying equipment.We manufacture various types of mineral processing machinery and equipment according to our customers' requirements. Our products are widely used for sorting gold, silver, copper, iron, tungsten,lead. zinc. tin. molybdenum, nickel, tantalum, niobium, manganese ore, coal, monazite, rutile,diamonds, other precious metals and precious metals mine, and for the flotation colored, black metal,precious metals and other minerals. And we have export qualifications, our products sell well all over the world for several years, especially exported to Brazil. India. Indonesia.South Africa. Somalia, Philippines. Malaysia. Sudan, Nigeria. Iran, Russia, Ghana. Kazakhstan Kyrgyzstan.Cambodia,Vietnam,Korea,Mongolia and other countries.After Sales Service8.Our service: 1.Pre-sale services: (1)Select equipment model; (2) Design and manufactLire products according to clients' special requirement; (3)Train technical personnel for dients.2.Services during the sale:(1) Pre-check and accept products ahead of delivery;(2)help clients to draft solving plans.3. After-sale services:(1) Assist dients to prepare for the first construction scheme;(2)Install and debug the equipment;(3) Train the first-line operators on site;
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...