IPDB › China Industry › Chemicals
China, Chinese Desiccant Blue White Silica Get for Oil-Immersed Transformer1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Chemical Auxiliary CatalystDesiccant SorbentTransformer PartsTransformer Desiccant
Henan Energy Electric Equipment Co.,Ltd
Preview:
Product Description Company ProfileHenan Energy Electric Equipment Co., Ltd. was established in 2011 and is an excellent and reliable power equipment manufacturer in China. The company mainly develops and produces oil-immersed transformers, dry-type transformers, box-type substations, high-voltage switches, and medium and low voltage complete sets of equipment. The equipment put into production and operation of the project advocates energy saving, intelligence, informatization, and mechanization. The company has established the Henan Triangle Energy-saving Transformer Engineering Technology Research Center, with 71 utility model patents and 15 invention patents. With years of accumulation in the transformer industry and strong technological innovation capabilities, HZEC products are sold to the Middle East, North America, South America, Europe, Southeast Asia, Africa, and other regions, covering more than 40 countries.Product DescriptionThe transformer desiccant, also known as the transformer respirator, is a transparent glass cylinder that is clamped to the upper and lower flanges with screws. The interior is filled with blue or white silica gel (desiccating agent) according to customer needs, and a fully transparent double-layer glass oil cup for transformer oil is installed at the bottom breathing port. The desiccant is an air purification device that mainly filters moisture in the air and prevents the transformer insulating oil from aging and deterioration. When the transformer inhales, the air entering the main transformer passes through the desiccant to filter out dust and moisture in the air, so that dry and pure air enters the main transformer. Product Parameters1. Ambient temperature: -30oC~43oC2. Working temperature: -30oC~60oC3. Ventilation resistance: ≤0.005MPa4. Material particles: φ2~6mm5. Adsorption capacity:At relative humidity of 20%, the adsorption capacity is ≥10%;At relative humidity of 40%, the adsorption capacity is ≥20%;At relative humidity of 80%, the adsorption capacity is ≥35%.Main Features1. The purification room adopts a fully transparent extended glass cylinder to extend the filtration time and improve efficiency;2. The bottom adopts a double-layer transparent glass oil cup, which can directly observe the transformer's inhalation and exhalation;3. The color-changing silica gel is used as a desiccant, and the moisture absorption can be directly observed, which is convenient for timely maintenance and care;4. The desiccant can be reused after heating and drying;5. The semi-sealed design ensures smooth breathing while having three-proof performance;6. The structure is simple and easy to operate during maintenance;7. It is made of high-strength glass with excellent explosion-proof and collision-proof performance;8. The company's latest developed breathing hole air channel design is adopted to ensure smooth and stable breathing.Outline DimensionNo.ModelHH1DInstallation sizeSilicon gel weight(kg)Transformer Oil (kg)Transformer capacity(KVA)1XS1-0.2174709085X850.2700≤80KVA2XS1-0.52501409085X850.51500≤200KVA3XS1-131017012085X8513500≤630KVA4XS1-1.534020012085X851.55000≤2000KVA5XS1-343025016085X85310000≤10000KVA6XS1-545026016585X85522000≤50000KVAConstruction Instructions1. During installation, first remove the sealing baffle and sealing gasket on the connecting pipe between the transformer oil pillow and the desiccant, replace the sealing ring and install the desiccant;2. Unscrew the oil cup at the bottom of the desiccant, remove the lower seal, add qualified transformer oil to the oil cup to the green line mark, and then install it on the desiccant;3. If the desiccant has been installed when the transformer leaves the factory, just unscrew the oil cup before the transformer is put into operation and proceed to step 2;4. During daily inspections, pay attention to the color change of the silica gel in the respirator. If the color of the silica gel changes from blue to light pink or red, it should be replaced in time to avoid affecting the filtering effect;5. The respirator oil cup should be installed with appropriate tightness. If it is screwed too tight, the respirator cannot work, and if it is screwed too loose, the filtering effect will be reduced.Certifications
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...