IPDB › China Industry › Industrial Equipment & Components
China, Chinese Simplified Installation of Pre Installed Components for Wood Chip Gasification Power Generation Equipment Takes Only 10 Days1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Gas Generation Equipment PartsGas Purification GeneratorQuick Installation TypePower Generation Equipment
Wuxi Powermax Renewable Energy Technology Co., Ltd
Preview:
Product Description The BIOWATT500&1000 biomass gasification system is built into multiple skid-mounted container-type frames, easy to ship and fast to install.The BIOWATT500&1000 complete system is built into multiple skid-mounted container-type frames that make transportation installation simple. This means that equipment is fully tested in the factory before arriving at site, minimizing commissioning time.Easy to operate and transport, the system can be unloaded from the truck and installed rapidly for quick operation.No need of factory building, on-site installation only takes within 7-10 working days.Complete solution for biomass power generation and heat supply.Easy installation with factory pre-assembly. Start / stop at any time.Compact and space-saving design.No need for factory building, suitable for many countries.System components such as transport system, de-ashing system, or fuel dryer available in combination with all Powermax equipment.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...