IPDB › China Industry › Instruments & Meters
China, Chinese Safe Overload Protector Load Limiter/Lifting Weight Limiter1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
SensorLoad CellLoad Limited SwitchOverload Limit Switch
Shaoxing Nante Crane Equipment Co., Ltd.
Preview:
Product Description Safe Overload Protector Load Limiter/Lifting Weight LimiterProduct DescriptionThe crane limiter is the overload protection device of the crane. The overload operation of the crane is one of the important reasons for the accident of the crane. The excessive stress generated by the overload operation can damage the transmission parts, break the steel wire rope, deform the structure and fail the braking, resulting in the downward deflection of the main beam of the crane, cracks and desoldering of the upper cover plate and web plate of the main beam, It will also cause major accidents such as boom and tower body breaking, and also cause motor overload and motor burning of electrical system. Therefore, overload is invented as protection.The clamp type overload limit switch, once the overload is confirmed, a high-frequency alarm will occur and the rising power supply will be automatically cut off, so as to protect the safety of people and mechanical devices. It is an ideal supporting product of the craneFeaturesApplication:3.2-600T craneDisplay Precision:≤5 F.SFunction:90% pre warning105% warning and closed the lifting up110% closed hoisting immediatelyTemperature:-15 to 60/≤90RHIP class:Sensor IP65, Instrument IP42Contact capacity:AC250V, 10APower supply: AC380V±10%, 50HZ ApplicationSingle and double beam crane, electrcial and chain hoist, winch and other lifting equipment Product technical parameters:1, all the stations were set:2, early warning: lifting weight reaches 90% of the rated lifting weight, intermittent sound and light alarm, but not to cut off the circuit.3, delay emergency alarm: lifting weight reaches 105% of the rated lifting weight, delay for 2 seconds a continuous sound and light alarm, and cut off the circuit, but does not affect the decline.1, immediately alarm point: lifting weight reaches 130% of the rated lifting weight, immediately issued a continuous sound and light alarm, and cut off the circuit.2, using the environment: - 10 ° C ~ + 60 ° C, humidity below 90% RH.3, power supply: ~ 380 v + 10%, 50 hz.4, relay contact capacity: ~ 250 v, 10 a.Installation instructions:When installation, as shown, installed in a fixed rope, such as no fixed rope, can also be installed in a balance wheel at the bottom of the steel wire rope, balance pulley 20 ~ 30 cm distance.Note: when installation, pressure piece of grooves on the steel wire rope, gland nut sensor screws into briquetting and close together.Connection details:This product has four lines, two root power (red, yellow), and two control (blue, green).When the powerOn the control of the 36 v terminals in the cabinet, the two control line series is on the rise of contactor coil control loop, as shown.Debugging:After completion of the overload limiter installation need to debug,The first step: reset,In the condition of empty hook, hold the meter box - > 0 please key for 3 seconds, the Numbers on the meter to zero and continuous flash for 3 seconds, is reset successfully.The second step: I set the alarm point,Method one:Use crane to lift first rated load weight (note: must be hung from the ground), and then hold the meter box on the M key for 3 seconds, rated weight on the digital display instrument, and continuous flash for 3 seconds, or set a success.(recommended) Example: a 5 t single beam crane, right after install the corresponding 5 t overload limiter, when empty hook to hold the first "0" button 3 seconds, and then put the 5 t weight lifting off the ground (must) from the ground, and then press "M" button 3 seconds set value, the full set after the action point load in the range of 5.25 t + / - 5%. Method 2:With crane lift a weight of a known weight first (note: 50% of the rated weight must be greater than the weight of the weight, and be sure to hang off the ground), and at the same time hold down the "+", "-" key about 3 seconds after the show "0.0" and then press the "+" input to lift heavy things again according to the weight of the "M" key 3 seconds, the digital display to lift heavy objects on the instrument and the weight of the scintillation for 3 seconds, which set a success.(this method for emergency plan, emergency alarm error when debugging by this method will be slightly larger, so it is not recommended)Example: a 5 t single beam crane, right after install the corresponding 5 t overload limiter, when empty hook to hold the first "0" button 3 seconds, and then put a weight of a known weight Hanging from the ground (heavy weight must be greater than 2.5 t and must be from the ground), and at the same time hold down the "+" and "-" key about 3 seconds to display "0.0" and then press the "+" input to lift heavy weights known again according to the weight of the "M" button 3 seconds to digital flicker, that is, set success. Company Profile FAQ Q1: Are you Manufacturer or Trading Company?A1:We are an integrated industrial and trade enterprises. We have our own R&D team, factory and marketing department,Q2: Which standard of your crane and crane components apply to?A2: Our Crane can design and manufacture base on FEM, CMAA, ISO EN, GB standard.Q3: How do you ensure your product quality?A3: All our processes strictly adhere to ISO-9001 procedures, which include Material Traceability, ISO WPQR and welder certificate, Measuring Device Calibration, NDT for the welding, and full assembling and load testing before delivery.Q4: How can I make payment?A4: We accept T/T bank transfer, L/C, Paypal.Q5: How can I assembly the cranes in my factory?A5: We suggest you to recruit a crane service team in local to install the crane base on our Installation Guideline and User manual. If cannot, we can send engineer to your factory to guide you do the installation with extra charge, and the transportation, accommodation, translator shall be covered by your side also.Q6: What is the warranty period, and how can I claim warranty If my crane have any issue?A6: Our warranty period is 12 months after cargo leave China port. If the crane have any issue, our after-sales team and engineer will help you solve the issue by email or Video conference. If the defect is caused by quality issue, we will ship the spare parts to you by air to help you fixed it as soon as possible.Q7: Do you accept OEM business?A7: Sure, we do many OEM productions for some famous crane brand and customers around the world.Q8: What about shipping?A8: We recommend small batch by the way of air or LCL, but large delivery by the way of container or bulk vessel.Q9: what about delivery time?A9: different capacity crane and components have different estimated delivery time, generally speaking, around 4 weeks to 8 weeks.Q10: What is your company policy if we want to distribute NANTE product in our market?A10: Firstly, thank you for your interest to promote NANTE brand, we have distributors in 50+ countries, pleaes no hesitate to contact us for the detail discussions, as we have different policies for the different target markets. Surely, you are welcomed to visit our factory and let's talk face to face.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...