IPDB › China Industry › Manufacturing & Processing Machinery
China, Chinese Europe Standard Powder Coating Line with Curing Oven and Chemical Spraying Washing Tunnel1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Spraying Machinery Spreading EquipmentCoating LinePowder Coating SystemPowder Coating System Manufacturer
Hebei Hanna Technology Co., Ltd.
Preview:
Product DescriptionWelcome to HANNA ! We have been with you for 34 years!HANNA delivers you the best powder coating lines with innovative, rational and economical solutions.HANNA supports you with advanced technologies and each piece of equipment to meet your specific needs.HANNA provides you with warranty and post-warranty service with full spare parts stock.We provide stand-alone equipments for preptreatment systems, powder coating systems, single and multi color change systems, curing systems, powder recovery systems and conveyorized lines. All the systems are widely used on the applications of automotive, home and office appliance, machines industry, metal fabrications and so on.SystemsTechnical Process and OptionsPretreatmentwashing, degreasing, etching, phosphating, blastingSpray Boothsmanual or automatic with powder recycle systemDrying&Curing Ovenstunnel ovens, bridge ovens, box ovensHeating Sourcecoal/diesel/bio-particles/L.P.G./N.G./electricityTransport systemchain conveyor, power and free conveyorProduct DescriptionSpray Pretreatment SystemDegreasing -pre-degreasing (hot water washing)-main degreasing (water washing)degreasingsurface conditioning-phosphating-washingdehydration drying,Different process are selected according to different workpieces. For workpieces that need to be rusted, shot blasting,sand blasting,etc. are required.Dip Tank Pre-treatment SystemFor the best powder coating results, the surface ofthe workpiece you will be spraying must be clean.The pretreatment method is divided into liquidprocessing and dry processing.Hanna offers you reasonable and economicalpretreatment methods to clean your workpiece.Powder Coating Booth1.No dust spillover, reduce powder waste.2,Quick color change(10-15 minutes automatic color change),Multi-color change.3,Powder recovery rate as high as 99.2%4,The workpiece groove has no bottoming phenomenon.5,Full consider the need for color change,easy to clean,Save labor time.Chain Conveyor SystemThe rail can be divided into150 rails ≤30KG, 250 rails ≤50KG (single point lifting)The drive unit in our high-end conveyor system uses a drive with a torque limiter. When the conveyor goes wrong, it can automatically stop. After the malfunction is removed, it can be restarted.1.Based on customer needs, provide the corresponding optimal design 2.Fine workmanship to ensure operational stability 3.Highly automated process to increase efficiencyTunnel Type Curing Oven1.Has wind curtain at both ends, the temperature of the furnace won't dissipate to the out, saves the fuel, this is our patent.2.Curing furnace insulation board are all plug-in board, seamless docking, thermal bridge transmission technology, save fuel3.Oil-burning heating type, hot air circulation air supply and return reach a balance, reasonable layout, uniform furnace temperature.After testing, the temperature difference in the furnace is less than ±3°C, reaching the performance index of the similar products of the advanced countries.1. Finish color changing within 10 minutes2. Powder recovery rate is up to 99.2%3. There is no powder spillover outside the spray booth.4. Stable temperature control.5. Over temperature alarm system.6. 150mm rock wool insulation board, keep the oven in long operation life and less heat spilt over.About UsPacking & Delivery & After-salesFAQFAQAre you a trader or a factory? We are manufacturer and exporter. Our own factory was found in 1990,Our export office was established in 2014.What should I provide if interested in your powder coating equipment ? A.The material/size(max)/weight(max)of your workpiece. B.How many of your daily output(one day=8hours,one month=30days)? C.What heating power do you prefer: electric, gas, diesel or coal? D.The size of your factory(length, width and height)?How to ensure the quality of the powder coating equipment? A,We have hundreds of patents and passed the IS9001:2015 quality management system certification. B,The Technical Review Committee, reasonably determines and divides the stages of design, production, installation and commissioning, and formulates detailed progress plans for each stage, Strengthen the quality assurance system and quality protection measures of equipment manufacturing department. C,We manning quality inspectors specially to control the processing quality of product strictly.How to install powder coating equipment after purchasing your equipment? A,We will provide installation information and installation videosB,Our engineers will guide the installation and run the equipment.C,After the debugging, will provide complete training and track customer device usage.How is your company's after-sales service done? A,Provide the list of consumables to assist customers in establishing a comprehensive equipment maintenance system.B,After the equipment is delivered to the customer, our company will send professionals to track the customer equipment for 60 days.C,If customer has a device failure in the process of using the device, our company will operate the device remotely through the computer network through the authorization given by the customer, and eliminate all equipment failure problems.D,Any problems with the equipment, our company guarantees to give solutions within 12 hours.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...