IPDB › China Industry › Industrial Equipment & Components
China, Chinese 30t VOD (Steam Jet Pump) Vacuum Deggasser1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Boiler FurnaceFurnace Parts30t VOD (Steam Jet Pump) Vacuum Deggasser3t Electric Arc Furnace
VILLE INDUSTRY CO., LIMITED
Preview:
Product Description 1. Main technical parameters1. Technical parameter1.1 Vacuum containerDiameter 4000mmHeight 4800mm1.2 Vacuum container coverDiameter 4000mmHeight 1600mmLifting speed 1-1.5m/minLifting stroke 900mmLifting mode Hydraulic1.3 Wire feederWire diameter Ф6-13mmFeeding speed 0-300m/min (VVVF)Motor power 11kw 1.4 Cover carSpeed 2-20m/minPositioning accuracy ±10mmDriven mode Mechanical (VVVF)Cables and pipes Articulated chain1.5 Steam injection pumpLevels5Air exhaust quantity150 kg/h (≤67Pa)Pumping amount variables properties67~105PaLimiting vacuum at pump port26 PaFor vacuum time≤8 min (P≤67Pa)Steam pressure≥0.8 MPaSteam temperature185-200oCSteam consumption7t/h (main pump start)1.6 Cooling water systemWater quality Industrial soft waterPH 7-8.5Hardness ≤10 german degree1.6.1 Equipment cooling water (clean circulation)Pressure 0.3-0.4 MPaInlet temperature ≤32oCOutlet temperature ≤50oCCirculation flow 50 m3/h1.6.2 Vacuum pump cooling water (muddy circulation)Pressure 0.3 MPaCirculation flow 390 t/h1.7 Argon panelWorking pressure 0.6-0.8Mpa (Max. 1.2MPa)Consumption 30-180 L/minPurity 99.99%1.8 Oxygen lance and valve standOxygen lance traveling stroke 1500mmOxygen lance traveling speed 1.5m/minOxygen working pressure 0.8MPaOxygen consumption 1200m3/h1.9 Compressed air systemWorking pressure 0.5 MPaConsumption 1.5m3/min1.10 Hydraulic power packWorking pressure 12MPaTank volume 1m3 2. Scope of SupplySNDescriptionQtyRemark1Vacuum container1 set 2Vacuum container cover1 setWith charging hopper3Cover car1 set 4Vacuum pipeline (estimated: 50m)1 set 5Compressed air valve stand1 set 6Cooling water distributor1 set 7Argon valve stand1 set 8Oxygen lance and valve stand1 set 9Water cooled dust collector1 set 10Hydraulic power pack1 set 11Steam injection pump c/w valves 1 set150kg12Vacuum main flap1 setDN80013L.V. control panels1 setGGD type14PLC automation & HMI (Siemens S7-300)1 set Supplied by the Buyer:1) Installation and installation material, furnace refractory lining, hydraulic medium, lubrication medium and cleaning medium, graphite electrodes;2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements), embedded furnace foundation parts;3) Water supply and gas supply main inlet are laid to Seller's equipment connection point, H.V. incoming line is connected to seller's H.V. switchboard and Transformer terminals, L.V. supply lines are connect to Seller's L.V. power distribution panel.3. Delivery: 4 month after date receiving down payment.WorkshopSales team:
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...