IPDB › China Industry › Chemicals
China, Chinese Manufacturer Supply Quiet Non-Explosive Rock Safe Silent Expansion Crushing Agent1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Concrete,Mortar AdmixturesWater Reducing AgentFree Rock CrackingNon-Explosive Demolition Materials
Beijing Xinjuxing Shunyuan Chemical Products Co., Ltd.
Preview:
Product Description Products DescriptionAfter-sales serviceOnline technical supportApplication scenarioconstruction industryDesign styleModernCharacterNon-ToxicCountry of originBeijingChinaBrandSYCompany ProfileCertificationsProduct packagingProduct NameSpecification (Kg)packaging1T quantityProduct DescriptionNon explosive demolition materials20Box501, Silent crushing agent usage:1. Require the safe dismantling of concrete structures that have been broken;2. The fragmentation of rocks;3. The mining of precious stones such as marble and granite.2, Usage of silent breaker:1. Preparation: Firstly, design the aperture, spacing, depth, and resistance line of the broken object based on factors such as material, structure, shape, and crushing requirements. The following are general crushing design parameters for reference:HSCA reference quantity for drilling parameters of broken objects in kg/m 3Aperture mm, hole spacing cm, hole depth resistance line cmSoft rock fragmentation 35~50 30~40 H 20~35 8~10Medium hard rock fragmentation 35~50 25~35 105% H 20~30 10~15Rock cutting 30~40 20~30 H 100~150 12~17Unreinforced concrete crushing 35~50 20~30 85% H 25~35 10~15Reinforced concrete crushing 35~50 15~20 H 15~25 20~25Note: (1) H - height of object fragmentation(2) Resistance line - refers to the sub straight distance from the borehole to the adjacent surface;(3) Row spacing=(0.6~0.9) hole spacing.2. Mixing: First, pour water with a weight ratio of 28-35% of HSCA into a container, then add HSCA and mix mechanically or manually (wearing rubber gloves when mixing by hand) to form a uniform slurry with fluidity.3. Filling: Before filling the hole, it must be cleaned and free of water and debris. The filling operation can be carried out by direct injection or by using a mortar pump. Vertical holes do not need to block the opening, while horizontal or inclined holes should block the opening to prevent the slurry from flowing out. Alternatively, dry and thick adhesive like HSCA can be rolled into strips and stuffed into the holes and compacted. 1. Maintenance: Construction in spring, summer, and autumn does not require maintenance. Generally, crushed objects can be broken within 5-24 hours after grouting. During winter construction below 5 ° C, water at around 40 ° C can be mixed and insulation or heating measures must be taken. Generally, crushed objects can be broken within 20-30 hours after grouting. The lower the construction temperature, the longer the time for the object to crack and break.3, Packaging and storage1. This product is packed in boxes, with a packaging specification of 20 kilograms per box;FAQQ1: Are you trading company or manufacturer? We are factory.Q2 : Do you provide samples? is it free or extra? Yes, we could offer the sample for free charge but do not pay the cost of freight.Q3 : Do you accept customization? OEM can be acceptable.We can produce according to your indicators.Q4 : How long is your delivery time? Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock.Q5 : What is your payment terms? T/T, Western Union, Paypal etc.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...