IPDB › China Industry › Metallurgy, Mineral & Energy
China, Chinese Yt27 Pneumatic Drill for Streamlined Mining Operations and Performance1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Drilling RigMine Drilling RigPneumatic Rock Drill SupplierEfficient Mining Equipment Supplier
Xianghe Kaituo Mining Machinery Co., Ltd.
Preview:
Product Description Product Description Features1. The YT27 Pneumatic Drill is engineered with the robust capability of effectively blowing and cleaning gun holes while delivering impressive torque for turning to braze, ensuring optimal performance.2. This remarkable YT27 air-legged rock drill not only inherits the strengths of its predecessors but also innovatively employs a flange control valve, enhancing its functionality with superior gas production features.3. Tailored for large-scale mining and extensive roadway projects, the YT27 air-legged rock drills stand as the pinnacle choice for demanding rock drilling applications.4. Equipped with advanced mechanisms such as air-water linkage, quick air-leg return, and adjustable air pressure, offering unparalleled efficiency and control.5. The ergonomically designed control handles are strategically positioned around the handle, featuring a novel mechanism that ensures ease of operation and user-friendliness.6. Featuring an innovative sound-deadening cover, this drill significantly reduces noise levels and allows flexible exhaust direction adjustments, enhancing on-site working conditions remarkably.Application Areas:Expertly crafted for utilization in railway, tunnel, highway, metallurgy, coal mine, and projects involving water conservancy and hydropower construction.Product Parameters ModelYt27N.W28kgLength688mmBit Head SizeR22×108mmAir Consumption≤80 L/SPercussive Frequency≥36.7 HzImpact Energy≥75.5 JBoreholes Diameter34-45mmPiston Diameter80mmPiston Stroke60mmWorking Air Pressure0.63 MpaWorking Water Pressure0.3 MpaDrilled Holes Depth2m-5mYT27 rock drills before use: Essential Pre-Operation Checklist for Optimal PerformanceWhat is a pneumatic rock drill? A Comprehensive Guide to Pneumatic Rock Drills and Their Unmatched Efficiency1. Prior to drilling, ensure complete integrity and seamless rotation of all components, including the rock drill, bracket, or rock drill cart. Infuse the necessary lubricant for smooth operation. Confirm the unobstructed flow of air and water channels, and verify the firm connection of all joints.2. Diligently inspect the roof near the work area to identify any loose or unstable rocks. Conduct a thorough assessment and perform any required stabilization measures for safety.3. The working surface for flat shell hole placement must be pre-flattened adequately to avert slippage or displacement during rock drilling operations.4. Avoid dry drilling at all costs. Commit to wet rock drilling by initiating water flow prior to wind commencement. Upon completion, cease wind operations before halting water flow. Begin drilling at a low speed, escalating to full speed upon reaching a significant depth to ensure precision.5. For safety, drillers must abstain from wearing gloves during drilling.6. When utilizing an air leg for drilling, maintain an optimal standing posture. Refrain from applying pressure with the body and never position yourself in front of the rock drill with the brazing rod, mitigating risk of injury from potential breakage.7. Should abnormal sounds or irregular water discharge occur during rock drilling, immediately pause operations for inspection. Diagnose and resolve the issue prior to resuming drilling to maintain safety and efficiency.8. When retracting the rock drill or changing the brazing rod, allow the rock drill to operate slowly. Remain cognizant of the rock drill braze's position to ensure a safe and controlled transition.Detailed Photos Frequently asked questions Unlocking the Price Advantage:As a distinguished integrated industrial and trade enterprise, we proudly present factory-direct pricing! This exclusive offer ensures our clients receive the utmost value and competitive edge.Delivery Timeline: What to ExpectAs the manufacturer, we are committed to efficiency, arranging production immediately upon order confirmation. For items readily available in stock, anticipate delivery within a swift 15 days. Larger orders may require up to 30 days to ensure precision and quality.Flexible Payment Options Tailored for Convenience:We primarily accept T/T or D/P to cater to your preferences. For T/T transactions, a 30% deposit initiates the process, with the balance of 70% due prior to shipment, ensuring smooth and secure transactions.Price Stability Assured: Validity InformationAs a reputable factory, we take pride in maintaining stable prices throughout the year. Adjustments are rare, occurring only in response to two primary factors: (1) Significant fluctuations in the U.S. dollar exchange rate; (2) Increases in labor or raw material costs necessitating manufacturer price adjustments.Transport Logistics: Ensuring Timely DeliveriesWe offer three main modes of freight transport to suit your needs: (1) Dominantly, 80% of our shipments are conducted by sea, reaching major continents such as Africa, South America, and the Middle East, ensuring widespread coverage.(3) For urgent light spare parts, air transportation is an option, delivering speed and efficiency when time is of the essence.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...