IPDB › China Industry › Metallurgy, Mineral & Energy
China, Chinese Drilling Fluid Linear Motion Double Shaker Shale Shaker1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Petroleum Equipment MachineryOilfield Shale ShakerShale ShakerLinear Motion Double Shaker
Shaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.
Preview:
Product DescriptionShale ShakerShale shaker is the first phase solids control equipment in oil drilling mud solids Control system and the important equipment in the mud recycling system as well. Generally, there are single shale shaker, duplex shale shaker and triple shale shaker. ZC can provide the shale shaker in different treatment capacity with customized service as per clients requirement.SpecificationProduct DescriptionThe Shale Shaker is mainly composed of a base, a screen box, an inclination adjustment device, a spring support assembly, a mud box, an electrical control system, etc. The screen box is installed in combination with the base and the inclination adjustment device through four sets of spring support devices on the left and right sides, thus forming a "spring-mass" vibration system.Two tilted vibration motors with equal mass and diameter rotate in opposite directions. According to the self-synchronization theory, under certain conditions, the rotational motion of the two vibration motors will follow each other and achieve synchronous opposite rotation with a phase difference of 0 in a short time.Environmental conditions for useAmbient temperature: -40℃ to +55℃Relative humidity of surrounding air: not more than 95%Explosion-proof grade: ExdⅡBT4Corrosive environment: no corrosive gas or steam that damages metal and insulationElectrical protection grade: IP55Technical Specifications(Custom configurations available upon request.)Model No.ZCZS/Z703(×2)ZCZS/Z2×703(×2)ZCZS/Z584(×2)ZCZS/Z2×584(×2)Vibration TrackSingle layerLinear MotionSingle shakerLinear MotionDouble shakerLinear Motion Single shakerLinear MotionDouble shakerDouble Layer(m3/h)Treatment CapacitySingle layer120240160320Double Layer150300200400(kW)Motor quantity PowerSingle layer2×1.84×1.82×2.24×2.2Double Layer2×2.24×2.22×2.44×2.4(g)Vibration Strength forceSingle layer≤7.2≤7.2≤8≤7.5Double LayerScreen Dimension quantitySingle layer700mm×1050mm-3700mm×1050mm-6585mm×1165mm-4585mm×1165mm-8Double Layer700mm×1050mm-6700mm×1050mm-12585mm×1165mm-8585mm×1165mm-16(°)Adjustable Deck Angle RangeSingle layer-3 to +3-3 to +3-3 to +3-3 to +3Double Layer(kg)Theoretical weightSingle layer1650410017504140Double Layer1710422018304300Dimension(Lmm×Wmm×Hmm)Single layer2700×1700×14504500×2700×17802800×1750×13804600×2800×1600Double LayerAfter Sales ServiceStandard Warranty: 12 months or 2,000 operating hours (whichever comes first).Extended Warranty: Optional coverage up to 36 months.Global Support: 24/7 technical assistance and spare parts supply.Training: On-site or remote operation/maintenance training.Company ProfileShaanxi Xixian New Area Zhongcheng Machinery Manufacturing Co., Ltd.Shaanxi Xian New Area Zhongcheng Machinery Manufacturing Co., Ltd. specializes in the production of drilling fluid solid control systems and mud waste treatment equipment. The main products cover petroleum machinery and equipment such as vibrating screens, sand removers, and vacuum degassing devices, which are applied in fields such as petroleum drilling, non excavation horizontal directional crossing, and coalbed methane drilling.FAQWhy Choose Us? Q1. Are you a manufacturer?Yes, we have our own independent workshop. We have been producing oilfield equipment for more than 15 years, and we check every piece of equipment carefully, and we always put the quality of the product in the first place, and now our equipment is widely used in oilfields all over the world.Q2. Do your equipment come with a warranty?Yes, our warranty is 1 year, and we will provide online maintenance support and on-site maintenance support.Q3. Can we customize your equipment?Yes, in fact 60% of our products are customized. We have a professional team that will professionally analyze all your proposals, you just need to tell us what you need (preferably with specifications and drawings) and we will make it happen for you.Q4. How do you deliver equipment?By sea or FOB, we will provide high quality service according to your requirements.Q5. What is the lead time for delivery of equipment and spare parts? It normally takes 30-45 days to manufacture a complete set of equipment. The lead time for spare parts is 15-20 days depending on the quantity. During the delivery period we will factually update you on the construction progress.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...