IPDB › China Industry › Manufacturing & Processing Machinery
China, Chinese Column Type Cantilever Crane/Column-Mounted Cantilever Crane1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Other CranesCoumn Type Cantilever CraneCantilever Crane
Quanzhou Aoge Hoisting Equipment Co., Ltd.
Preview:
Product Description COTILEIICFile previewBatchDocWord document batch processing toolBZ fixed column jib cranesayMingshuBatchDoc.Word document batch processing toolBatchDocWord document batch processing tooldirectoryOverview of the scope of application and structureSecond, the main technical parameters and dimensions3. Structure and operationFourth, lifting5. Installation6. Test runSeven.Use maintenanceVIII. AnnexesBatchDocWord document batch processing toolBatchDocWord document batch toolAn overviewBZ fixed column jib crane is a new product developed by our factory with reference to the equipment imported from West Germanyproducts, according to the needs of the user design of special lifting equipment, with a novel structure, reasonable, simple and operationalIt is easy to use, flexible to rotate, large working space, etc., and is energy-saving and efficient material liftingIt can be widely used in factories and mines, workshop production lines, assembly lines and machine tools up and down and warehouses.Wharf and other occasions several heavy objects lifting.This machine is composed of columns, slewing arms, several chain electric hoists, etc. The lower end of the column is fixed in the mixOn the soil foundation, the swing arm rotates, and it can be rotated according to the user's needs. The swing part is divided into handsDynamic rotation and electric rotation (cycloidal pinwheel reducer is installed and driven on the upper supporting plate or lower supporting plateThe tube rotates the arm). The electric chain hoist is installed on the jib track and is used to lift heavy loadsThing.Second, the main technical parameters and dimensions1. Main technical parametersLifting height(m)2,2.5,3,3.5,4,4.5,5,5.5,6Lifting speed(m/min)8/2,4/1,10/2.5,5/1.25,2.6/0.7Running speed (m/min)14Maximum swing radius2,3,4,5,6Angle of rotation: degrees≤270°Rotation speedManual or 0.8r/min (electric)BatchDocWord document batch processing toolBatchDocWord document batch processing tool2. Performance parameters and dimensions of electric chain hoist:See the attached electric hoist "Operation and Maintenance Manual".3. Structure and operationThis machine is mainly composed of 4 parts: column, beam, reducer and electric chain hoist.The electric chain hoist has the function of lifting and reciprocating on the beam.The beam can have a reducer on the supporting plate to drive the rotating pipe to run the rotary movement.The electrical part is shown in the attached drawing: electrical principle and electrical wiring diagram. The electrical control box is installedchain hoist.The operation of this machine is realized by the flashlight button. The flashlight has eight buttons, which are controlled separatelyFast up, fast down, slow up, slow down, left and right rotation of a few hoist trolleys are horizontal forward and backwardWalk.Note:1. Do not press the fast and slow button and the reverse rotation button of the same motor at the same time during operation2. When working, it is forbidden to stand under the crane arm.3. It is forbidden to drag heavy objects.4. It is forbidden to overload lifting.Fourth, liftingFor the convenience of transportation, this machine adopts disassembly and packaging, and the user can do it by himself according to the method introduced in this bookInstallation, (see "Five" Installation)The lifting method of beam and column is shown in Figure 2, Figure 3.5. InstallationBefore installation, the product and technical documents should be checked according to the packing listIt should be corrected or restored separately, and the rotating parts such as shafts and bearings should be rotated every six monthsCleaning and lubrication.1. The column should be installed so that the column is perpendicular to the ground, and the anchor plate screws should beTighten firmly, there should be no loosening, and the floor and foundation should fit wellWell, if equipped with an electric hoist, the foundation should be embedded with cables and grounding facilitiesThe embedded cable is drawn from the center of the foundation, and the grounding resistance shall not be greater than 4 ohmsGoverness.2. Beam installationFor beam installation, please proceed in the following order.1)First, lift the beam horizontally and insert the shaft back from the upper and lower palletsBowls.2)Install the reducer on the pallet3)Install the electric hoist and the walking trolley on the swingarm beam track.(The installation method is strictly in accordance with the "Use and Maintenance" attached to the electric chain hoist.)Manual)4)Install the slip wire frame and wire rope (or C-rail) at the top of the beam.(The rope is strung into the slip ring and tightened, and there is a self-made gliding trolley in the C-shaped track,And it should be on the same side as the electrical control box on the electric chain hoistAbove. )5) Wire connection and installation of all electrical appliances on the beam, and leave a long onedegree appropriate power cord.(See electrical schematic diagram and electrical wiring for wiring.)BatchDocWord document batch processing toolBatchDoeWord document batch processing toolFig). The slip coil or C-type rail trolley and the cable are tied with a tie wireFixed.After the above steps are completed, the overall hoisting can be measuredWhen hoisting, the lifting method specified in Figure 2 can be.Sixth, the commissioningAfter all the installation is completed, the test run can be carried out.Before the car, add 30# mechanical oil to the rotary reducer to the median position without the standard (change it for half a yearoil once). During the test run, press each button first to check the running direction and the flashlight door pointWhether the symbols match, if not, can be adjusted.No-load test: the electric hoist should run left and right on the beam and when lifting up and downIt should be corrected or restored separately, and the rotating parts such as shafts and bearings should be rotated every six monthsCleaning and lubrication.1. The column should be installed so that the column is perpendicular to the ground, and the anchor plate screws should beTighten firmly, there should be no loosening, and the floor and foundation should fit wellWell, if equipped with an electric hoist, the foundation should be embedded with cables and grounding facilitiesThe embedded cable is drawn from the center of the foundation, and the grounding resistance shall not be greater than 4 ohmsGoverness.2. Beam installationFor beam installation, please proceed in the following order.1)First, lift the beam horizontally and insert the shaft back from the upper and lower palletsBowls.2)Install the reducer on the pallet3)Install the electric hoist and the walking trolley on the swingarm beam track.(The installation method is strictly in accordance with the "Use and Maintenance" attached to the electric chain hoist.)Manual)4)Install the slip wire frame and wire rope (or C-rail) at the top of the beam.(The rope is strung into the slip ring and tightened, and there is a self-made gliding trolley in the C-shaped track,And it should be on the same side as the electrical control box on the electric chain hoistAbove. )5) Wire connection and installation of all electrical appliances on the beam, and leave a long onedegree appropriate power cord.(See electrical schematic diagram and electrical wiring for wiring.)BatchDocWord document batch processing toolBatchDoeWord document batch processing toolFig). The slip coil or C-type rail trolley and the cable are tied with a tie wireFixed.After the above steps are completed, the overall hoisting can be measuredWhen hoisting, the lifting method specified in Figure 2 can be.Sixth, the commissioningAfter all the installation is completed, the test run can be carried out.Before the car, add 30# mechanical oil to the rotary reducer to the median position without the standard (change it for half a yearoil once). During the test run, press each button first to check the running direction and the flashlight door pointWhether the symbols match, if not, can be adjusted.No-load test: the electric hoist should run left and right on the beam and when lifting up and downIt should be corrected or restored separately, and the rotating parts such as shafts and bearings should be rotated every six monthsCleaning and lubrication.1. The column should be installed so that the column is perpendicular to the ground, and the anchor plate screws should beTighten firmly, there should be no loosening, and the floor and foundation should fit wellWell, if equipped with an electric hoist, the foundation should be embedded with cables and grounding facilitiesThe embedded cable is drawn from the center of the foundation, and the grounding resistance shall not be greater than 4 ohmsGoverness.2. Beam installationFor beam installation, please proceed in the following order.1)First, lift the beam horizontally and insert the shaft back from the upper and lower palletsBowls.2)Install the reducer on the pallet3)Install the electric hoist and the walking trolley on the swingarm beam track.(The installation method is strictly in accordance with the "Use and Maintenance" attached to the electric chain hoist.)Manual)4)Install the slip wire frame and wire rope (or C-rail) at the top of the beam.(The rope is strung into the slip ring and tightened, and there is a self-made gliding trolley in the C-shaped track,And it should be on the same side as the electrical control box on the electric chain hoistAbove. )5) Wire connection and installation of all electrical appliances on the beam, and leave a long onedegree appropriate power cord.(See electrical schematic diagram and electrical wiring for wiring.)BatchDocWord document batch processing toolBatchDoeWord document batch processing toolFig). The slip coil or C-type rail trolley and the cable are tied with a tie wireFixed.After the above steps are completed, the overall hoisting can be measuredWhen hoisting, the lifting method specified in Figure 2 can be.Sixth, the commissioningAfter all the installation is completed, the test run can be carried out.Before the car, add 30# mechanical oil to the rotary reducer to the median position without the standard (change it for half a yearoil once). During the test run, press each button first to check the running direction and the flashlight door pointWhether the symbols match, if not, can be adjusted.No-load test: the electric hoist should run left and right on the beam and when lifting up and downSmooth, the swingarm beam should be flexible and stable when rotating, and should stop in any position whileIt does not slip on its own, and the outer end has a certain upward deflection. FER/250 (R is the rotary half.)path).Rated load test: In the case of rated load, the crane hook is located away from the columnThe most distal limit position lifts the heavy object, and performs a rotation (electric or manual), and the test lifting 1In 5 minutes, the distal drop value of the cantilever should not exceed R/125mm.In order to prevent accidents due to operation failure, a generator must be installed near this craneIn case of emergency, the switch that can cut off the power supply, the crane cable should adopt JB678-77 regulationsSet YZ-500V medium-sized rubber sheathed cable (one of which is grounded, so use four-core electricity.)cable).BatchDocWord document batch processing toolBatchDocWord document batch processing tool7. Use and maintenance1. The operator should strictly abide by the crane operation procedures and do not allow overload use.2. It is not allowed to use the terminal baffle as a normal parking method.3. The chain or steel rope that binds heavy objects must have sufficient strength, and the binding must be firm and reliable.The rope or chain should be added to the acute angle of the heavy object, and the rope on the crane must be patchedIn the center of the hook does not slip out.4. The lifting and moving of heavy objects should be carried out in a vertical situation, and it is forbidden to use electric hoistsLulai dragged or forcibly lifted heavy objects buried in the ground, and it was not allowed to turn the craneRun drag and impact work.5. It is strictly forbidden to stand on the top of the heavy objects, and pedestrians are strictly prohibited below.6. When work is finished or resting, heavy objects should not be suspended in the air.7. Every six months, the rotating parts should be accumulated on the lower wing surface of the beam (at the walking track).Polymers, rack materials, and frame paint can be repainted or repainted depending on the peeling condition.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...