IPDB › China Industry › Manufacturing & Processing Machinery
China, Chinese Adjustable Telescopic Mast Top Drive Mining Coal Water Well Rig Drilling Equipment1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Water Well Drilling RigDrilling EquipmentTop Drive Drilling Rig
LIANYUNGANG FORWARD HEAVY INDUSTRIAL MACHINERY CO., LTD.
Preview:
Product Description Product DescriptionFORWARD TDR-50 Multifunction Top Drive Drill RigTDR -50 is mainly used for coal bed methane exploration, water well drilling, rescue well drilling, shallow oil and gas, mine exploration drilling etc.The TDR-50 multifunction top drive rig enables each user to drill with following methods, with borehole diameters of 4" (108 mm) to 47" (1 200mm) and drilling depths up to 1500m.Drilling Type:Rotary-drilling with direct circulationRotary-drill with reverse circulationAuger drillingPercussion core drilling(ram coring)Wire line core drillingDown-The-Hole hammer DC and RC drillingDrilling Depth Guidelines:Use 5" rod: 600-1000mUse 4-1/2" rod: 800-1300mUse 3-1/2" rod: 1000-1500m* The figures in these tables have been calculated, based on field experiences, based on a vertical, straight, and clean down hole. Actual drilling capacity depends on in-hole tools, conditions, drilling techniques and equipment used.MountingCrawler, Undercarriage of Excavator. Moving Speed3 Km/hPower UnitDiesel EngineSTEYR-WEICHAI Diesel engine, 2 valves,turbocharged intercooled.Power330 HPCylinder and Displacement6 cylinders, 9.726 LCapacity of Fuel Tank680 LMastLength of Mast ( Fully Expanded)62" (18.9m)Length of Mast (Fully Retracted)39.4" (12 m)Stroke of Feeding45.93" (14 m)Stoke of Mast Slipping143.7" (3.65m)Rod and CasingI (18-22 feet), II (27-30 feet), III (38-45 feet)Feeding SystemCapacity of Pull Back Force110 230 lbf (500 KN)Capacity of Pull Down Force26 455 lbf (120 KN)Max. Pull Back Speed19 m/minMax. Pull Down Speed55 m/minDrill Head4 Shifts, 8 Speeds 1st shift270 - 600 RPM 3 850 - 2 150 Nm2nd shift150 - 280 RPM 3 850 - 6 850 Nm3rd shift95 - 170 RPM 6 250 - 11 000 Nm4th shift60 - 110 RPM 9 000 - 16 800 NmLuffing Angle of Drill Head0 - 90° (from perpendicular to vertical level)Main WinchLine Pull30 KNWire Rope Diameter14 mmWire Rope Length45 mCoring WinchLine Pull15 KNPull Speed0-280 m/minPull Speed0-280 m/minPower TongThe tongs are designed and manufactured according to SY/T5074 standard and API Spec 7K"Specification for Drilling and Well Servicing Equipment".Size Rang3 1/2" coupling - 8" bodyMax.Torque100 KNmRotation Speed2.7 - 40 RPMDimensions and WeightLength in Transport / Working Position12.1 m / 8.16 mWidth in Transport / Working Position2.9 m / 2.9 mHeight in Transport / Working Position3.4 m / 18.9 mWeight33 000 Kg→ More technical parameters please click to contact us!Detailed PhotosGeneral:The TDR-50 which is assembled by FORWARD Heavy instruction Machinery Co., Ltd, is mounted on the undercarriage of excavator with a total weight of 35 ton. The engine power 243 KW.Mast:Constructed of high tensile steel and hydraulically elevated, mast lifting and lowering and degree of slope controlled by four[4] double acting hydraulic cylinders. The mast is equipped with4 guide rails for the carrier of the drill head and a suspension for the feed device. The rig is also equipped with slipper system, in order to the mast slip, and the stroke is 3.65m, the mast can be reliably based on the ground. The rig can be set up the blowout preventer and other systems.Mud Line System:All mud lines on the TDR-50 Drilling Rig have 3"(76.2mm) diameter, in order to reduce friction losses to a minimum.Top Drive Head:Top drive head suits for tricone bit, DTH hammer, PDC Drill bit and diamond bit which meets special demand of rotate speed and torque during work. The 4-shift Gearbox using spur gear drive, oil bath lubrication. Hydraulic Motor and gearbox could provide for much high speed and torque to be adjusted.The angle of rotate unit could be adjusted asneeded, ranges from 0" [vertical) -90".The water connector can hold a pressure maximum 35Mpa.Electrical System:Generator and battery are driven by diesel engine and provide 24V direct-current power supply. All cables are protected with seal line. Furthermore, all circuits are equipped with short-circuited plunger.Additional Rig Components:TDR-50 Rig can be modified. All kinds of aggregates, required for different drilling methods, can be installed on the rig at customer request, or supplied as stand-by aggregates.→ To learn more details, please do not hesitate to contact us!Main ProductsFORWARD GROUP mainly produces:Coring Drill Rig (for mineral geological core drilling)Water Well Drill Rig (for water well drilling)Horizontal Directional Drill Rig (for underground pipe laying)Multifunction Top Drive Drill Rig (for coalbed methane exploration, water well, rescue well, shallow oil and gas drilling)Auxiliary drill tools and spare parts (for drilling rigs)CooperationForward Group is an international group company whose main business focuses on underground driling equipment and auxiliary tools. With the mission of maximizing the value of customers, the company provides high-quality underground driling equipment and tools, and strives to help customers achieve the best economic benefits.1. Long-term cooperation with numerous customers2. Participation in renowned drilling rig industry exhibitions around the world3. More and more customers become friends with us and visit the factory on site.→ Welcome to our Factory!Company Profile FORWARD GROUP is an international company designing and producing the drill rigs. The mission of the company is to provide high-quality drilling equipment and related services.FORWARD GROUP mainly produces:Coring RigWater Well RigHorizontal Directional Drill RigMultifunction Top Drive Drill RigAuxiliary drill tools and spare partsThe company pays a lot of attention to the technical innovations and products development. We have design and engineering teams in the world. And with our global supplier to make the high-quality production.FORWARD GROUP provides:High Quality Drilling EquipmentFull Technical Support and ServiceSpare parts, Drill Tools and Consumable MaterialsTraining and Consulting ServicesPackaging & ShippingCertificationsFAQQ 1. What guarantees do you give for equipment?A We have a 24-hour customer service, ready to fulfill all warranty liabilities anywhere in Russia.Q 2. Can you train our team?A With the purchase of equipment we provide free theoretical and practical training and carry out technical support on the firstproject.Q 3. Why FORWARD factory is located in China?A The decision to place FORWARD production site in China was taken by FORWARD Group management not by chance. We strove to producehigh quality equipment, keep the low prices and ensure high production rate. At the present time, perhaps, only China provides thebest opportunities in the terms of production time, quality and prices.Q 4. What are the advantages of FORWARD HDD rigs?A FORWARD HDD rigs have exclusive power; the operation of rigs on real sites has shown that for many specifications actual valuesexceed the nominal ones. Special functions of thrust force and rotation acceleration significantly increase the efficiency ofwork.Q 5. Can you produce drilling equipment according to our technical specification?A FORWARD factory accepts orders for the production of drilling equipment according to your individual project. Drilling rigs withpulling capacity from 100 tons could be designed according to your technical specification. Besides, there is a range of optionsand special functions available on all drilling rigs. We are ready to take into account your wishes and release unique equipmentfor you.Q 6. Why does the cost of FORWARD equipment different from Chinese?A In the production of FORWARD equipment we use only the best European and American components. At the same time, the assemblywork is carried out in China to guarantee our customers the reasonable price without loss of quality.Q 7. Is FORWARD Chinese equipment?A FORWARD equipment was developed by a Russian company in partnership with German engineers. The head office and warehouse of thefactory are located in Kazan, Russia. We placed our factory in China due to optimize the transportation and assembling cost.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...