IPDB › China Industry › Manufacturing & Processing Machinery
China, Chinese Wholesale Sport Running Track Surface Spraying Machine Coating Machine1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Paving MachinerySpray MachineWholesale Machine
Hangzhou Gff Import & Export Co., Ltd.
Preview:
Product DescriptionProduct DescriptionProduct NameSpraying MachineProduct ModelDS-120/PTJ-30/PTJ-80/PTJ-100/PTJ-120Voltage220V/380VWeight400kg/70kg/220kg/300kg/500kgPower(W)12.5kw/3.5kw/5.5kw/7.7kw/10.5 kwSize Dimension(L*W*H)1750x 1000 x1100mm/720x450x900mm/1100 x 550 x 930mm/1150 x 750 x 950mm/1600 x 1000x1100mmSpray Output Capacity12-15kg/minEffective Hopper volume120L/30L/80L/100L/120LThe spraying machine uses high-pressure non-foaming technology to convert coatings, preservatives or special functional liquids into uniform particle streams. It forms a highly adhesive and defect-free continuous coating on the substrate surface, achieving functional treatments such as anti-corrosion, waterproofing, fireproofing or insulation.NOTESOn Time routine maintenance is the cleaning and inspection carried out before, during, and after the operation of the machine. It mainly checks the condition of key and vulnerable parts (such as mechanical safety devices), coolant, lubricant, fuel level, instrument indicators, etc.1. First-level Maintenance: Generally involves cleaning, tightening, and lubrication operations, and includes partial adjustment operations to maintain the technical condition of the machinery in good order.2. Secondary Maintenance: Includes all contents of primary maintenance, with inspection and adjustment as the focus, to maintain the good working performance of the mechanical assemblies, mechanisms, and parts.3. Seasonal Maintenance: The main content is to replace the lubricating oil and fuel oil suitable for the season, implement antifreeze measures, and add antifreeze facilities.4. Maintenance during the Running-in Period: After the running-in period of a new machine or repaired machinery is completed, running-in period maintenance must be performed. The main contents are cleaning, tightening, adjusting, and replacing the lubricant.5. Transfer Maintenance: Transfer maintenance should be carried out before the machine is transferred to the construction site. The maintenance content can be determined according to the technical status of the machine, and if necessary, anti-corrosion treatment can be carried out.6. Decommissioning Maintenance: Decommissioned or stored machinery should be maintained, This maintenance focuses on cleaning, anti-corrosion, and moisture-proofing.Company Profile
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...