IPDB › China Industry › Manufacturing & Processing Machinery
China, Chinese Steel Wheel Rim Vlave Hole Punching Machine1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
C Frame Hydraulic PressPunching MachineRim Valve Hole Punching Machine
Shandong Xiaoya Precise Machinery Co., Ltd.
Preview:
Product Description Valve Hole Punching PressDuring the wheel rim manufacturing process, formed and sized rims still need a valve hole punched in them using a machine press. Xiaoya Precision Machinery Company supplies valve hole punching presses for pressing and punching valve holes on the tubeless wheel rims. This hole punching machine uses a dual power hydraulic system and is comprised of the main machine, the drive mechanism, and the electrical control cabinet.Main Features1. The punch press has an independent hydraulic transmission unit and electrical control cabinet.2. The hydraulic punch press uses a PLC control system, and has three operating modes: adjustable, manual, and semi-automatic.3. This machine features over-stroke and over-pressure protection, as well as emergency stop and filter block warning functions.4. The working pressure, speed, and stroke of this valve hole punch can be adjusted according to processing needs.5. This process can realize the automatic transmission operation of work pieces.Technical Parameters of Valve Hole Punching Press No.ItemsParameters1ModelYPCK-400YPCK-8002Nominal force for plane pressing (main sliding block)400KN800KN3Max. stroke of sliding block300mm400mm4Nominal force for hole punching250KN320KN5Max. stroke of punching cylinder25mm25mm6Max. distance between lower surface and work table670mm670mm7Slide block size200×200mm300×200mm8Throat depth180mm200mm9Workbench dimension380×180mm380×180mm10Height between workbench and ground750mm750mm11Production Efficiency>6pcs/min>4pcs/min12Motor power11.5Kw18.5KwTRADE Terms1 Delivery TimeThe manufacturing time will be 4-6months from the date of receipted down payment.1 month for factory testing (buyer come to factory for testing), optimize and customs clearance procedure.Loading sea port: Qingdao, China2 Payment TermsThe payment terms will be T/T L/C based on FOB Qingdao, China trade terms.3 Factory TestingThe Buyer can send engineers to Manufacturer's factory for testing those machines before delivery if it is necessary, and the cost of Buyer's engineers including flight, train, hotel and meals shall be at Buyer's own cost.4 WarrantyThe manufacturer shall guarantee the machines are brand new and correspond in all respects with the quality, specifications and performance as stipulated in this agreement, and also guarantee that the machines when correctly mounted and properly operated and maintained, will give satisfactory performance for a period of 12 months since the date of arrived in Buyer's port.5 Offer Validity:Price validity: 60 days from the date of this quotation.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...