IPDB › China Industry › Manufacturing & Processing Machinery
China, Chinese 7000lbs Topwind Trailer Square Tube Jack with Pipe Mount Drop Leg RV1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Lifting JackTrailer Square JackTrailer Square Tube Jack
Ningbo Soaring Trailer Parts Co., Limited
Preview:
Product Description Product Description7000lbs Topwind Trailer Square Tube Jacks with Pipe Mount Drop Leg RVIntroducing the TOW-MAX square tube jack from Ningbo Soaring Trailer Parts Co., Limited. This jack is designed to meet all your trailer operation needs with the highest quality and best performance. Made with heavy-duty reinforcement ribs and zero water retention, this jack offers durability and improved performance. The painted outer tube with final finish primer, zinc-plated inner, and drop leg ensure long-term reliability and smooth, easy cranking. The easy lubrication system enhances gear and bearing life, making this jack a reliable choice for your trailer.Product ParametersProduct CodeSupport CapacityHandle StylesTravelBracket Height (A)Retracted Overall Height (B)Drop leg adjust heightFinishUnit Wt. (lbs)Qty/PalletSJP5002BF5,000 lbTopwind15"15"24-3/4"N/Ablack powder coating18.375SJP5002SBF5,000 lbSidewind15"15-3/4"24-3/4"N/Ablack powder coating19.375SJP7002BF7,000 lbTopwind15"16-1/2"25-1/2"N/Ablack powder coating22.875SJP7002SBF7,000 lbSidewind15"14-1/2"25-1/2"N/Ablack powder coating24.375SJP7002BD7,000 lbTopwind15"14-1/2"25-1/2"13"black powder coating2775SJP7002SBD7,000 lbSidewind15"14-1/2"25-1/2"13"black powder coating2875Detailed PhotosNingbo Soaring Trailer Parts Co., Limited1) Do you have a factory?Stone: Yes, we have our own factory and engineers to meet custom requirements.2) Do you provide samples? Free or charge?Stone: Samples can be provided for client approval. Normal samples may incur a cost, which can be considered for return upon placing an order.3) What is your MOQ?Stone: MOQ is 1-200 for jacks and jack wheels, and 3000 for trailer parts assembly.4) Can you manufacture parts according to our size?Stone: Depending on tooling, we can support achieving fixed size requests for items.5) What is your term of payment?Stone: Normally TT or Irrevocable L/C at sight for bulk orders, and Paypal for samples.6) How long is your delivery time?Stone: Normal delivery is 25 working days, peaking at 35 working days.7) Can I deliver goods from another supplier to your factory for joint loading?Stone: Yes, we can accept and support joint loading.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...