IPDB › China Industry › Manufacturing & Processing Machinery
China, Chinese Candy Machine Producing Line Lollipop Maker Ce ISO9001 (GDL150/300/450) (GDL)1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Food Beverage Cereal Production LineCandy MachineCandy Depositing Line
Beijing Yinrich International Trading Co., Ltd.
Preview:
Product Description The processing(production/producing/making) line is an advanced and continuous plant for making different sizes of flat-type lollipop (confectionery)candy (stick-add by manual for flat pops), also can make the two-color striped lollipops, and ball-type lollipop (stick-adding can be done automatically) and hard candy. It is an ideal equipment(machine/maker) which can produce(make) out good quality products with the saving of both the manpower and the space occupied.Commodity:Gdl150/300/450L deposited hard candy & lollipop producing lineFeatures:1) PLC /computer process control available2) An LED touch panel for easy operating3) The production(producing) capacity from 150 kgs/h to 450kgs/h4) The main body is made of hygienic stainless steel5) Optional (mass) flowing controlled by frequency inverters6) In-line injection, dosing and pre-mixing techniques for the proportional addition of liquid7) Dosing pumps for the automatic injection of colors, flavors and acids8) Use automatic steam control system instead of manual steam valve which controls a stable steam supply to the microfilm cooker9) "Two-color striped" lollipop, candy can be madephotos in our customers' plant:samples of this processing line: ModelGDL150GDL300GDL450GDL600Production capacity kg/h(based on 6gm candy)120250350400Max. of the product g10101010Speed of stroke n/min20~2520~2520~2520~25Steam consumption kg/hSteam pressure Mpa2500.2~0.63000.2~0.64000.2~0.65000.2~0.6Electric power needed18kw/380V27kw/380V34kw/380V42kw/380VCompressed air consumptionCompressed air pressure0.2mP 3 P /min0.4-0.6Mpa0.25mP 3 P /min0.4-0.6 Mpa0.3mP 3 P /min0.4-0.6Mpa0.4m3/min0.4~0.6MpaConditions needed for the cooling system:1.Room temperature(C)2.Humidity (%) 20~2555 20~2555 20~2555 20~2555Gross weight Kgs4500550065008500UDELIVERY DATE:Within 35 days upon the receipt of the down payment DELIVERY:Ex. Our Works at Shanghai, ChinaTERMS OF PAYMENT:40% by T/T as the down payment, the balance shall be issued a L/C at sight confirmed by the Seller's bank, and to be paid at the presentation of the shipping documents.OTHERS:WARRANTY:The buyer guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery, the buyer will replace the parts or send the technicians to go to the buyer's site for repairing and maintenance at the seller's cost(FREE). If the defaults are aroused by the defaulted operations, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...