IPDB › China Industry › Manufacturing & Processing Machinery
China, Chinese ISO Certificate Tube Mill of Wet Cement Ball Mill1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Mining MillTube MillCement Mill
CITICHL HEAVY INDUSTRIES CO., LTD.
Preview:
Product Description ISO certificate tube mill of wet cement ball mill 1. Tube mill of cement ball mill:Cement ball Mill is mainly used for grinding various cement clinker or other materials in building material, metallurgical, electric and chemical industries.2. Sorts & Features:a. Common Cement MillIt is mainly used in cycle grinding system, with features of high grinding efficiency, high production, low power consumption. Especially, when grinding slag cement, its performance is more outstanding. Generally speaking. Production could be 10-20% higher, and power consumption 10% lower. Besides, product temperature could reduce 20-40oC and product fineness is easy to adjust.b. High fineness & production cement millIt is mainly used in open flow grinding system. with features of simple equipment system & process flow, saving investment, less building area. Regarding structure, it has advanced & special material separating diaphram device inside, adds activation device to fine grinding chamber, and has discharging grate plate at mill outlet, thus to reduce the size of grinding media at the most and promote the grinding efficiency highly, realise the purpose of high production & low power consumption.3. Working principle of cement ball mill:Take the cement mill for example. Material is fed to the rough grinding chamber in the mill through the chute of feeding device. Grinding medium of large size impacts on the material and then material is crushed. Fines go into the fine grinding chamber through double partition. It is further impact and ground by the grinding medium of small size. Production of required fineness flows through the discharging pipe and is discharged from the discharging device. It is separated in the separator. Cold air flows in the mill to reduce the temperature inside. Fine powder is conveyed out of the mill to guarantee the product quality and improve the grinding efficiency.4. Technical parameters of cement ball mill: Spec./m(Dia.×Length)Speed(r/min)Feeding Size(mm)Capacity(t/h)Grinding Media Loading(t)Main Motor(KW) Main ReducerWeight(t)Φ2.2×9.021.5<2514~1539475ZD7069Φ2.2×9.521.5<2514~1641475ZD7074Φ2.2×1121.5<2516~1850570ZD80109Φ2.2×1321.5<2520~2258630ZD80114Φ2.4×1020.3<2518~2052630ZD80108Φ2.4×1120.3<2519~22(Open flow)57630ZD8011622~25(Cycle flow)Φ2.4×1220.3<2521~23(Open flow)63800MBY71012824~26(Cycle flow)JDX710Φ2.4×1320.3<2522~24(Open flow)68800MBY71013825~28(Cycle flow)JDX710Φ2.6×1119.7<2524~2669800MBY710138JDX710Φ2.6×1319.7<2528~32821000MBY800158JDX800Φ3.0×9.018.2<2528~32781000MBY800158JDX800Φ3.0×1118.2<2531~35951250MBY800178JDX800Φ3.0×1218.2<2532~361001250MBY800182JDX800Φ3.0×1318.2<2533~371081400MBY900190JDX900Φ3.2×1117.8<2540~451101400MBY900215JDX900Φ3.2×1317.8<2545~501281600MBY1000230JDX1000Φ3.2×1317.7<2550~55(Cycle flow)1281600JS120-A230MFY160Φ3.2×1417.8<2548~531381800MBY1000249JDX1000Φ3.5×1117.1<2555~60(Cycle flow)1351800JS120-B220MFY180Φ3.5×1317.3<2560~65(Cycle flow)1562000JS130-A275Φ3.8×1217<2563~68(Cycle flow)1752500JS130-C197Φ3.8×1317<2565~70(Cycle flow)1902500JS130-C245Φ4.0×1316.3<2575~80(Cycle flow)2002800JS140-A250Φ4.2×1115.8<25100~110(Cycle flow)1952800JS140-A248Φ4.2×1315.8<25110~120(Cycle flow)2303150JS140-C255Φ4.2×1415.6<25120~135(Cycle flow)2523550JS150-B270Φ4.2×1515.6<25140~150(Cycle flow)2704000JS160-B288Φ4.6×1415.1<25140~150(Cycle flow)2854200JS160-C320Φ4.6×1515.1<25150~160(Cycle flow)3054500JS160-D335FAQQ: Are you a manufacture? A: Yes, we are manufacture; our factory was established in 1981.We focus on providing expert service including design, manufacture, installation & maintenance for the logistic industries & mining equipments.Q: Terms of Payment: A: 30% of the total amount by TT as deposit, the balance to be paid by TT before the machines leaving seller' factory. Or 100% irrevocable L/C at sight. Q: Guarantee period: A: The guarantee period for the above machines is twelve months from the date of putting into use, It is not applicable for quick wear parts.Q: If i need the complete cement production line. Are you able to help us build it?A: Yes, we can help you combine a complete cement production line. And give you related professional advice as long as you need. There is a rich experience engineer team of us. We had already built many cement projects in China & Overseas. We can do turn key project for you. If any questions or needs pls contact me freely at mobile : 0086-18238804869
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...