IPDB › China Industry › Manufacturing & Processing Machinery
China, Chinese High-Performance Bored Pile Drilling Rig for Large Foundations1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Mine Drilling RigHigh-Efficiency RigBored Pile Drilling Rig
Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.
Preview:
Product Description Product Description Tianwei KL series of Bored Pile Drilling Rig are new generation of multi-functional piling machinery, which are mainly big model that can drill hole specified with diameter of 1000mm. The products are widely applied in both civil and industrial construction work of foundation piling for urban constructions, railway, deep excavated retaining projects etc. There are two types due to different movement methods, crawler type KLU and walking type KLB, thus could be adopted in different geological conditions, and different foundation construction methods. Multi-function drilling rig can be equipped with:1.power head, the bored pile drills can finish cast-in-place concrete CFG pile and grouting piles driving by anger rig.2. Vibrating hammer. Compression device can finish cast-in-place concrete piles, expanded piles with immersed tube.3.hydraulic static pile or diesel pile. Can do precast piles and prestressed Piles.4.Three-axises power head for underground continuous wall construction5.Lifting tools for uplifting piles Advantages1.Crawling mechanism and walking mechanism can be ex-changed.2.The column can be adjusted from two sides to ensure verticality of the drilling hole.3.drilling and piling at the same time. Improves the efficiency of drilling holes and shortens the time of the project.4. No noise, no vibration, no pollution and good quality of drilling holes.5. Accuracy and convenience in position by up and down the column6.Operation systems like electronic system, hydraulic system, monitor system are all gathered in the operation room for comfortable and convenient operation. Structure design 1. The column is foldable. The complete appliance can attached with towing device to be transported from different construction sites. 2. The power head system uses three-ring reducer mechanism, with great weight bearing capacity, and reliable in use. 3. The side adjustment mechanism can work independently to adjust the verticality of the column. 4. Spiral vane of the drilling rod uses high quality carbon steel 16Mn, which is hard-wearing, good in strength. The bit inlays carbide blades to drill faster than normal. 5. The main windlass uses reducer with greater reduction ratio, which is simple in structure but good in the rope-arranging work. the parameters are as below: ITEMKLB20-600KLB26-800KLB32-800walking wayElectro-hydraulic stepelectrical walking-typeelectrical walking-typemax drilling depth20m26m32mmax drilling diameter600mm800mm800mmmax output torque36KN.m48.5KN.m65KN.mrod rotated speed20r/min20r/min20r/minallowed lifting force240KN400KN640KN power for power head45KW*255KW*255KW*2reductor of power headZZSH430ZZSH450-45ZZSH480-60lifting way of leaderthree points supportthree points support three points supportleader sizerectangle section530mm630mmleader depth23m30.5m36.6mleader oriented center distance600*102600*102600*102leader incline rangefront inclination 5°back inclination 3°front inclination 5°back inclination 3°front inclination 5°back inclination 3°rotary wayrotary motorrotary motorrotary motorrotary angle≤360°≤360°≤360°rotary speed0.25r/min0.25r/min0.25r/minstroke 1.05m1.5m1.8mlenth of the walking track5.0m6.0m7.3mclimbing ability of pile frame4°4°4°speed of incline adjust line0.55r/min0.55r/min0.55r/minsingle pulling force4T8T8Tmotor power18.5KW22KW22KWincreasing speed18.5m/min18.5m/min18.5m/minsingle pulling force1.5T1.5T3Tmotor power7.5KW7.5KW13KWlifting speed25m/min25m/min25m/minoverall dimensionL*W9m*4.5m10m*5.2m11.5m*6mtotal weight(T)526378 Packaging & Shipping1) Minimum order: 1 unit.2) Valid period: 15days.3) Package: Nude package.4) Payment: 30% of total contract price by TT as deposit, balance amount of total contract price by TT upon inspection before delivery to China sea port for export.5) Delivery: Approximated 20 days ready for inspection at China factory from the day of receiving the deposit in full amount. Our ServicesTo train operating,maintenance and construction people for our customers.? Always be ready to answer technical questions concerned from our customers.? Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.? To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns.? Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers. ? We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only. Company InformationContact us
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...