IPDB › China Industry › Manufacturing & Processing Machinery
China, Chinese Mo-3b Breaker Pneumatic Air Hammer Pneumatic Rock Drill1 Industrial Products Supplier Manufacturer Details, price list catalog:
China Industrial Products Supplier Manufacturer List Catalog
Mine Drilling RigDelication BreakerConcrete Hammer
Fuzhou Golden Moral Imp & Exp Co., Ltd.
Preview:
Product Description MO-3B Delication breaker Pneumatic air hammer Pneumatic rock drill MO-4B MO-2B Product Description: 1.It can be applied to the uran construction for breaking the old roadway, to the facilities installation of industrial and mining enterprise for breaking the original concrete ground. 2. It can be applied to break firm and freezed ground in civil engineering,substruction and civil air defence works and so on. 3. It can be applied to cut coal layer and break soft mineral in mining industry.ModelMO-4BMO-3BMO-2Bweight9.6KG9KG8.5KGImpact Energy55J/MIN44J/MIN39J/MINImpact Frequency17Hz19.2Hz22.5HzWorking Pressure0.63 Mpa0.63 Mpa0.63 MpaAir Consumption1.5m3/dcm?kw1.5m3/dcm?kw1.5m3/dcm?kwDia of Air Hose/Pick24mm24mm24mmLength of Tail Pick70mm70mm70mmG10 Pneumatic PickInstructionG10 pneumatic pick is suitable for drilling in mine, crushing incompetent bed, concrete and clay, destroying hard or frozen stratum and other athletics occasion which need impact. Technical SpecificationTotal Length 570mmWeight 10kgRammerweight 0.9kgRammer dia 38mmRammer stroke 155mmAir pressure 0.63MpaImpact energy 43JImpact frequency 16HzAir consumption 26L/sAir pipe inner dia 16mmDrill 500mmMaintenancePneumatic pick is a exactitube tool that make reciprocating impact, should pay attention to maintenance.Please abide the following maintenance rules.1, Air pipe inner dia is 16mm and length is not excess 12 m, the air pressure should be kept at 0.5-0.6Mpa, and keep air pipe clean and fasten hose nipple.2, When assembling machine, check clearance between drill shank and fixing sleeve, hold handle and force pressure to it slowly, ensure that work normally.3, Working regularly, oil machine through the pipe connecter every 2-3 hours(3-4.5°E50 turbine oil)4, Do not insert the whole machine into ledge,when drilling incompetent bed.5, When machine was jammed in crevice, do not draw out it powerfully, it will damage machine.6, If dirty block strainer, romove it.Don't take off strainer.7, When using machine,dismantle it at least twice a week, use diesel oil to clean and dry, then oil, later assemble and operate machine.8 ,If machine should stop for along time, dismantle and clean it, then oil and keep in storehouse.
Purchasing Request
Note: Send your purchase request, and we will screen suppliers or manufacturers for you free of charge...